Skip to main content

NOC 09-05

Friday, April 28, 2023
Year
NOC Topic
Development and Submission of Test Plans for Modifications to EAC Certified Systems
Description

Test Plans submitted for modifications to previously EAC certified voting systems should be brief and structured to minimize test plan development and review, while enabling the EAC to maintain solid control of the certification process. The test plan shall concisely document the strategy and plan for testing those sections of the VVVSG applicable to the modification or modifications submitted. The test plan shall be written with clarity that will allow all constituents to understand what testing will be conducted, to verify compliance to VVSG requirements, and to assure that the test plan will remain a living document throughout the life of the test campaign for the modification.

Section of VSTL Program Manual
N/A
Section of Cert Manual
N/A
Date