Manufacturer
Testing Lab
Impacted Device/System
This product can be used with the following EAC certified Democracy Suite (D-Suite) systems: 5.5, 5.5-A, 5.5-B, 5.5-C
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
Added Cisco 8-port Ethernet Switch (CBS350-8T-E-2G) due to the DELL x1008 Ethernet Switch becoming commercially unavailable for purchase. This product has been tested with Windows 10 Pro and is suitable for use with existing D-Suite configurations using that operating system on the EMS Express Servers.