Skip to main content

DVS-100762

Testing Lab
Impacted Device/System


D-Suite  5.5-B, 5.5-C
 

Date Approved by EAC
08/18/2021
Short Description of Changes

The ICP2 LCD and touch panel assembly (DVS PN 123-000439) currently assembled by Bi-Search International (BSI PN TAG057VTN01.1-DV), but to mitigate lead-time issues and availability of modules assembled by vendor BSI, Dominion has added one new vendor to produce the assembly using the same identical COTS parts that are used in the BSI assembly. The assembly by Avalue Technology has been tested to ensure it meets Dominion’s production specifications. Avalue is providing this assembly under their own internal part number (ES-60000000069R).

Additional Documentation