Manufacturer
Impacted Device/System
HP Z4 G4 Workstation and P244 Display
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
The Commercial Off the Shelf (COTS) workstation that Hart uses for its Verity workstations, the Hewlett Packard (HP) Z240, is End-of-Life (EOL) and no longer manufactured. Hart will use the HP Z4 G4 workstation as an equivalent replacement to the HP Z240. The COTS display for use with the HP Z240 is also EOL and is replaced. The manufacturer has recommended that the P232 display be replaced by the P244. New drivers are required to be added to the OS image to support the equivalent workstation hardware, however, the Windows operating system build and Verity Software are not modified by the change.