Manufacturer
Testing Lab
Impacted Device/System
ExpressVote Tabulator with EVS 5400, EVS 5410, EVS 6000, EVS 6020, EVS 6021, EVS 6030, EVS 6040, EVS 6043
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
This ECO documents a modification to the ExpressVote tabulator. This modification consists of installing a strip of Laird conductive gasket onto the exit guide of the ExpressVote.