Manufacturer
Testing Lab
Impacted Device/System
Federal: EVS 5.2.0.0, EVS 5.2.1.0, EVS 5.2.2.0, EVS 5.2.4.0, Unity 3.0.1.0, Unity 3.0.1.1, Unity 3.4.1.0
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
This ECO documents the update of the left and right LCD hinges with increased thickness LCD panel leaf. The reason for the change is to improve durability of the spare part. This part will be utilized as a field retrofit as needed to replace broken hinges.