Manufacturer
Testing Lab
Impacted Device/System
DS300 Ballot Bin Units; EVS 6.3.0.0, EVS 6.4.0.0.
Date Submitted by Manufacturer
12/01/2023
Date Approved by EAC
12/05/2023
Short Description of Changes
This ECO impacts fielded DS300 Ballot Bin Unit hardware for EVS 6.3.0.0 & 6.4.0.0. This minor hardware change does
not alter the system’s reliability, functionality, capability, or operation.