Manufacturer
Testing Lab
Impacted Device/System
Tote Bin DS200/DS300
EVS 5.2.4.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0, EVS 6.4.0.0
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
This ECO introduces security upgrades to the Tote Bin. Per the submitted ECO, the upgrades consist of adding a security gasketing kit on the Tote Bin to prevent access while locked, as detailed in the submitted technical documentation. The purpose of the security gasketing is to prevent cards and/or ballots from entering through the gaps along the hinge area of the Tote Bin