Manufacturer
Testing Lab
Impacted Device/System
EVS 6.4.0.0, EVS 6.3.0.0 , EVS 6.5.0.0
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
This minor change introduces a change to the seal lock loop rivet of the DS300 Ballot Box and does not alter the system’s reliability, functionality, capability, or operation. Based on the information provided, it has been determined that no further testing is necessary.