Manufacturer
Testing Lab
Impacted Device/System
EVS 6.0.6.0, EVS 6.2.0.0, EVS 6.3.0.0, EVS 6.4.0.0, and EVS 6.5.0.0 voting systems impacted.
DS950 1.0 and DS950 1.1 devices impacted.
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
This ECO covers the addition of the plastic stopper to block the output tray sensor arm from entering the recessed area of the DS950. This is intended to prevent the sensor arm from potentially getting stuck in the recessed area and causing a false bin full message and does not alter the system's reliability, functionality, capability, or operation. Based on the information provided, it has been determined that no further testing is necessary.