Manufacturer
Impacted Device/System
DS200 Scanner, Emergency Bin
Date Submitted by Manufacturer
04/15/2011
Date Approved by EAC
05/10/2011
Short Description of Changes
Modified Emergency Bin to improve ballot stacking, specifically redesigning the ballot diverter bracket to direct ballots into the bin. Also revised drawing to increase opening size and created a field upgrade kit.