Manufacturer
Impacted Device/System
Verity Voting 1.0, 2.0, 2.2 Mod, 2.2.1, 2.2.2, 2.3, 2.3.3, 2.3.4, 2.4, 2.6 Systems
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
ECO-01512 makes several clarifying clerical updates and adds an additional construction
method for an existing internal device cable. There are no changes to the production Verity device
assemblies.
The following changes are made in this ECO:
Clerical Verity Duo series baseboards correction. A duplicate reference designator is removed.
Three cable drawings are updated to clarify that any connector tooling points are to be covered.
An alternate construction method for an internal cable is provided.