Manufacturer
Impacted Device/System
Verity Relay Kit Modem
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
The COTS 4G "Cellular Dongle" USB modem used in the Verity relay kit has been revised by the manufacturer, MultiTech. The metal shielding on the USB cable is now grounded (soldered) to the circuit board inside the modem enclosure to improve EMC performanc