Skip to main content

HRT-01649

Manufacturer
Impacted Device/System

All Verity Releases

Date Approved by EAC
06/06/2024
Short Description of Changes

ECO-01649 accommodate the following:

  •  The End-of-Life notice of the Brother PJ-723 thermal printer used within the Verity Touch Writer Duo series of devices. The product model is replaced with an equivalent model, the PJ-823.
  • The End-of-Life notice of the Advantech CFast card used within all Verity devices. The 16GB model is no longer manufactured and is being replaced with the equivalent 32GB model from the same manufacturer.
  •  The Touch Writer Duo Printer Bracket plastic is updated to improve assembly during manufacturing.