Testing Lab
Impacted Device/System
FreedomVote Scan (FVS) using OpenElect 2.2 and 2.2.3
Date Submitted by Manufacturer
07/17/0023
Date Approved by EAC
07/20/2023
Short Description of Changes
A modification of the carry handle of the FVS. The handle will be changed to a Nylon to provide additional strength and flexibility, with a longer screw, washer and nut.