Testing Lab
Impacted Device/System
FreedomVote Scan with OpenElect 2.2. and 2.3
Date Submitted by Manufacturer
09/12/2023
Date Approved by EAC
09/26/2023
Short Description of Changes
Add a a new USB retention bracket to the PC subassembly and a cable tie to the lower FVS to secure the USB cable.