Testing Lab
Impacted Device/System
OpenElect OCS
Date Submitted by Manufacturer
09/09/2021
Date Approved by EAC
11/22/2021
Short Description of Changes
Add Dell Latitude 5520 with CentOS 7.9. Using CentOS 7.9 as the baseline OS with the ElRepo kernel 5.13.9_el7 for driver support for OpenElect 2.X versions of the OCS/OVCS.