Skip to main content

Engineering Change Orders

Wednesday, January 24, 2024
An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Engineering Change Orders

Search by:

Filter by:

Manufacturer

ECO Manufacturer Testing Lab Impacted Device/System Date Approved
DVS-100843 Dominion Voting Systems Corp Pro V&V

Imagecast Precinct 2 - DVS 5.5-B and 5.5-C

04-21-2022
DVS-100845 Dominion Voting Systems Corp Pro V&V

ImageCast Evolution on D-Suite 5.5-B and 5.5-C

05-16-2022
DVS 100849 Dominion Voting Systems Corp Pro V&V

ImageCast Precinct 2, on D-Suite 5.5-B and 5.5-C

05-16-2022
DVS-100850 Dominion Voting Systems Corp Pro V&V

ImageCast Precinct 2 on D-Suite 5.5-B and 5.5-C

05-16-2022
DVS 100864 Dominion Voting Systems Corp Pro V&V

All D-Suite configurations - Election Management System

07-06-2022
DVS-100891 Dominion Voting Systems Corp Pro V&V

EMS Express Server


D-Suite: 5.5, 5.5-A, 5.5-B, 5.5-C, 5.5-D
 

01-13-2023
DVS-100898 Dominion Voting Systems Corp Pro V&V

ImageCast Evolution PCOS-410A with D-Suite 5.5-B, 5.5-C, 5.5-D

11-29-2022
DVS-100903 Dominion Voting Systems Corp Pro V&V

EMS Client Workstation and ADJ Client Workstation


D-Suite: 5.5, 5.5-A, 5.5-B, 5.5-C, 5.5-D

01-13-2023
DVS-100904 Dominion Voting Systems Corp Pro V&V

ICC Canon Scanner Workstation


D-Suite: 5.5, 5.5-A, 5.5-B, 5.5-C, 5.5-D

01-13-2023
DVS-100918 Dominion Voting Systems Corp Pro V&V

 ImageCast Central (ICC), HiPro workstation for Democracy Suite 5.5-B, 5.5-C, 5.5-D, and 5.17.

04-07-2023
DVS-100921 Dominion Voting Systems Corp Pro V&V

ImageCast Voter Activation (ICVA) client workstation for Dominion Democracy Suite 5.5, 5.5-A, 5.5-B, 5.5-C, 5.5-D, and 5.17.

 

 

05-12-2023
DVS-100924 Dominion Voting Systems Corp Pro V&V

Democracy Suite 5.17

10-13-2023
DVS-100936 Dominion Voting Systems Corp Pro V&V

Impacted System:

Democracy Suite 5.17

 

Impacted Device:

ImageCast X

09-24-2024
DVS-100942 Dominion Voting Systems Corp Pro V&V

All D-Suite Voting Systems EMS and ImageCast Central. 

10-30-2023
DVS-100961 Dominion Voting Systems Corp Pro V&V

EMS servers for Dominion Democracy Suite 5.17

02-26-2024
DVS-100974 Dominion Voting Systems Corp Pro V&V

Democracy Suite 5.5-B
Democracy Suite 5.5-C
Democracy Suite 5.5-D
Democracy Suite 5.17

03-20-2024
DVS-100975 Dominion Voting Systems Corp Pro V&V

Democracy Suite 5.5-B
Democracy Suite 5.5-C
Democracy Suite 5.5-D
Democracy Suite 5.17

03-20-2024
DVS-100982 Dominion Voting Systems Corp Pro V&V

All D-Suite system configurations that include the HiPro scanner workstation or the Canon scanner workstation.

03-28-2024
DVS-101007 Dominion Voting Systems Corp Pro V&V

Device: IOGEAR USB 3.0 High-Speed Multi-Card Reader; Systems: Democracy Suite 5.5, Democracy Suite 5.5-A, Democracy Suite 5.5-B, Democracy Suite 5.5-C, Democracy Suite 5.5-D, and Democracy Suite 5.17.

10-15-2024
DVS-101025 Dominion Voting Systems Corp Pro V&V

All D-Suite system configurations that include the DELL P2422H monitor.

02-27-2025
ECN 125 MicroVote General Corp. Pro V&V

Microvote EMS

04-29-2020
ECN 126 MicroVote General Corp. Pro V&V

MicroVote EMS 4.4

07-10-2020
ECN 128 MicroVote General Corp. Pro V&V

EMS V4.1 system

07-14-2020
ECN 129 MicroVote General Corp. Pro V&V

EMS 4.3-A

07-14-2020
ECN 129 MicroVote General Corp. Pro V&V

MicroVote EMS V4.3-A System

07-14-2020
ECN 130 MicroVote General Corp. Pro V&V

MicroVote EMS V4.41 System

09-18-2020
ECN-132 MicroVote General Corp. Pro V&V

EMS V4.4-IN and V4.41 VVSG V1.0 compliant voting systems. 

03-11-2021
ECN-134 MicroVote General Corp. Pro V&V

EMS V4.41 and EMS V4.4-IN

08-18-2021
ECN-135 MicroVote General Corp. Pro V&V

MicroVote EMS Systems

11-09-2021
ECO 01349 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

Verity Case

07-14-2020