Skip to main content

Engineering Change Orders

Wednesday, January 24, 2024
An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Engineering Change Orders

Search by:

Filter by:

Manufacturer

ECO Manufacturer Testing Lab Impacted Device/System Date Approved
HRT-01592 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

All Verity Devices and Releases.

03-24-2023
HRT-01598 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

The ECO impacts Verity 2.7 Voting systems.

06-28-2023
HRT-01599 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

This ECO affects Data/Build, Central, Scan, and Reader software in the Verity Voting 2.7 system.

07-21-2023
HRT-01605 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

This ECO affects Verity Transmit Receiving Station within the Verity Voting 2.7 system. 

06-30-2023
HRT-01619 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

Impacted Systems:

Verity 2.7

 

Impacted Devices:

Verity Central

Verity Scan

Verity Scan with Relay

09-29-2023
HRT-01646 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

Verity 2.7

Verity Data

03-14-2024
HRT-01649 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

All Verity Releases

06-06-2024
HRT-01658 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

Verity Touch Writer, Verity Print and Verity workstations using Verity Voting 2.7

06-27-2024
HW-1086 Clear Ballot Group, Inc. Pro V&V

ClearAccess component (ClearCount 2.0)

03-18-2020
HW-4211 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.0, ClearVote 2.1, ClearCount 1.6

02-19-2021
HW-873 Clear Ballot Group, Inc. Pro V&V

ClearCount and ClearDesign (ClearVote 2.0)

01-31-2020
HW-879 Clear Ballot Group, Inc. Pro V&V

ClearCount Scanner (ClearVote 2.0)

03-23-2020
HW-880 Clear Ballot Group, Inc. Pro V&V

ClearCount 2.0 (ClearAccess component)

03-23-2020
MVT-136 MicroVote General Corp. Pro V&V

MicroVote EMS (Infinity and VVPAT components)
MicroVote EMS 4.0, 4.0B, 4.1, 4.2, 4.3-A, 4.4, and 4.41 systems

03-30-2023
MVT-137 MicroVote General Corp. Pro V&V

MicroVote EMS (All-In-One Voting Station booth)

MicroVote EMS 4.0, 4.0B, 4.1, 4.2, 4.3-A, 4.4, and 4.41 systems

03-30-2023
MVT-138 MicroVote General Corp. Pro V&V

Impacted Device:

Dell Latitude 3520, Dell Latitude 3540

Impacted System:

MicroVote EMS V4.41

11-22-2023
MVT-139 MicroVote General Corp. Pro V&V

All EMS Versions:
 - MicroVote EMS 4.0
 - MicroVote EMS 4.0-B
 - MicroVote EMS 4.1
 - MicroVote EMS 4.2
 - MicroVote EMS 4.3-A
 - MicroVote EMS 4.4
 - MicroVote EMS 4.41

08-14-2024
SW-7679 Clear Ballot Group, Inc. Pro V&V

ClearVote 1.5, 2.0

08-27-2020
SW7679 Clear Ballot Group, Inc.

ClearVote 1.5, 2.0, and 2.1 (ClearDesign, ClearAccess, and ClearCount components

08-27-2020
UNS-1001 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Made changes to the following parts: 512 MB DDR Memory Module, 80 GB Hard Drive, and USB Flash Drive: DDR Memory Module andHard Drive wer added to the approved list because of being more readily available currently. Flash drive more ESD resistant case was added.

05-17-2010
UNS 1025 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect 2.2 

02-24-2022
UNS 1026 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect 2.2 - Freedom Vote Scan

02-24-2022
UNS 1027 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect Freedom Vote Scan

07-26-2022
UNS-1028 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

FVS

OpenElect 2.2

OpenElect 2.2.3

07-06-2023
UNS 1029 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

FreedomVote Scan (FVS) using OpenElect 2.2 and 2.2.3

07-20-2023
UNS 1030 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

FreedomVote Scan with OpenElect 2.2. and 2.3

09-26-2023
UNS-16842 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Removed "EAC APPROVED" and moved "UNISYN" logo to center on OVO and OVI label.

05-24-2010
UNS-16844 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Make changes to BOM and riase Rev. from A to B. The replacement motherboard had been granted a CE Declaration of Conformity for testing that was comparable to that required by the EAC 2005 VVSG.

08-22-2011
UNS-16847 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Updated AC distribution cable

05-24-2010
UNS-16855 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Printer, Star TSP743II-24, Serial Interface, Gray, OVI - new flash ROM supplier forced a change to the mainboard and a change to the firmware.

11-30-2010