Skip to main content

Engineering Change Orders

Wednesday, January 24, 2024
An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Engineering Change Orders

Search by:

Filter by:

Manufacturer

ECO Manufacturer Testing Lab Impacted Device/System Date Approved
ESS-1055 Election Systems & Software, Inc (ES&S) Pro V&V

DS200 Collapsible Ballot Box

12-19-2019
ESS-1059 Election Systems & Software, Inc (ES&S) Pro V&V

EVS 6.1.0.0

02-21-2020
ESS-1060 Election Systems & Software, Inc (ES&S) Pro V&V

EVS Electionware 6.1.0.0

02-21-2020
ESS-1062 Election Systems & Software, Inc (ES&S) Pro V&V

ElectionWare 6.1.0.0

02-22-2020
ESS-1068 Election Systems & Software, Inc (ES&S) Pro V&V

Electionware Postgres DB

05-27-2020
ESS-1100 Election Systems & Software, Inc (ES&S) Pro V&V

Federal: EVS 5200, EVS 5203, EVS 5210, EVS 5220, EVS 5240, EVS 6000, EVS 6020, EVS 6030, EVS 6040, EVS 6043
State: EVS 5241, EVS 5320, EVS 5340, EVS 5341, EVS 6040 AZ, EVS 6050, FL EVS 4520 v1r2, FL EVS 4530 v1r2, FL EVS 4530 v2r3

10-14-2020
ESS-1106 Election Systems & Software, Inc (ES&S) Pro V&V

ExpressVote Tabulator with EVS 5400, EVS 5410, EVS 6000, EVS 6020, EVS 6021, EVS 6030, EVS 6040, EVS 6043

02-19-2021
ESS-1111 Election Systems & Software, Inc (ES&S) Pro V&V

Federal: EVS 6100, EVS 6110

04-05-2021
ESS-1151 Election Systems & Software, Inc (ES&S) Pro V&V

DS950
EVS 6.0.6.0, EVS 6.2.0.0, EVS 6.3.0.0

03-07-2023
ESS 1153 Election Systems & Software, Inc (ES&S) Pro V&V

ExpressTouch and ExpressVote XL using EVS 6.3.0.0

05-30-2023
ESS-1154 Election Systems & Software, Inc (ES&S) Pro V&V

DS300 Ballot Box Scanner for EVS 6.3.0.0.

03-08-2024
ESS-1156 Election Systems & Software, Inc (ES&S) Pro V&V

DS950 Scanner for EVS 6.0.6.0, EVS 6.2.0.0 and EVS 6.3.0.0.

02-14-2024
ESS-1158 Election Systems & Software, Inc (ES&S) Wyle Laboratories

ES&S Unity 3.2.0.0 Rev. 3, Unity 3.4.0.0 or EVS 5.0

DS200

07-19-2013
ESS-1162 Election Systems & Software, Inc (ES&S) Pro V&V

DS300 Ballot Bin Units; EVS 6.3.0.0, EVS 6.4.0.0.

12-05-2023
ESS-1164 Election Systems & Software, Inc (ES&S) Pro V&V

Impacted System:

EVS 6.3.0.0

EVS 6.4.0.0

EVS 6.5.0.0

Impacted Devices:

DS300

10-01-2024
ESS-1165 Election Systems & Software, Inc (ES&S) Pro V&V

Tote Bin DS200/DS300
EVS 5.2.4.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0, EVS 6.4.0.0

05-15-2024
ESS-1168 Election Systems & Software, Inc (ES&S) Pro V&V

Expressvote XL on EVS 6.0.0.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.3.0, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0, and EVS 6.4.0.0

04-04-2024
ESS-1174 Election Systems & Software, Inc (ES&S) Pro V&V

DS300 Scanner for the EVS 6.3.0.0 and EVS 6.4.0.0

04-03-2024
ESS-1176 Election Systems & Software, Inc (ES&S) Pro V&V

DS850 Scanner using EVS 6.4.0.0 

04-15-2024
ESS-1177 Election Systems & Software, Inc (ES&S) Pro V&V

Add Brother HL-EX415DWVS Printer to DS450 using EVS 6.3.0.0 and EVS 6.4.0.0

04-15-2024
ESS-1178 Election Systems & Software, Inc (ES&S) Pro V&V

Add Brother HL-EX415DWVS Printer to DS950 for EVS 6.0.6.0, EVS 6.2.0.0, EVS 6.3.0.0 and EVS 6.4.0.0

04-15-2024
ESS-1184 Election Systems & Software, Inc (ES&S) Pro V&V

Expressvote XL with EVS 6.0.0.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.3.0, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0 and 6.4.0.0.

08-02-2024
ESS-1187 Election Systems & Software, Inc (ES&S) Pro V&V

The DS300 ballot boxes for the:

EVS 6.3.0.0.

EVS 6.4.0.0.

EVS 6.5.0.0.

08-26-2024
ESS-1188 Election Systems & Software, Inc (ES&S) Pro V&V

EVS 6.5.0.0

09-16-2024
ESS-1190 Election Systems & Software, Inc (ES&S) Pro V&V

EVS 6.0.6.0, EVS 6.2.0.0, EVS 6.3.0.0, EVS 6.4.0.0, and EVS 6.5.0.0 voting systems impacted.

DS950 1.0 and DS950 1.1 devices impacted. 

02-25-2025
ESS-1251 Election Systems & Software, Inc (ES&S) Wyle Laboratories

ES&S Unity 3.2.0.0 Rev. 3, Unity 3.4.0.0 or EVS 5.0

DS200

07-19-2013
ESS-1398 Election Systems & Software, Inc (ES&S) Wyle Laboratories

ES&S Unity 3.2.0.0 Rev. 3, Unity 3.4.0.0 or EVS 5.0

07-19-2013
ESS-1400 Election Systems & Software, Inc (ES&S) Wyle Laboratories

ES&S Unity 3.2.0.0 Rev. 3, Unity 3.4.0.0 or EVS 5.0

07-19-2013
ESS-683 Election Systems & Software, Inc (ES&S) NTS Huntsville (formally Wyle Laboratories)

DS200 Scanner

05-10-2011
ESS-702

DS200 Scanner

06-16-2011